Expansion of the waste water treatment plant (WWTP) Bad BerleburgAfter 30 years of operating, the sewage treatment plant is going to be expanded by buildings for anearobe, mesophilic sludge digestion.continue
-
Residential and commercial building, GüterslohStructural work for the construction of a four-storey residential and commercial building.continue
-
waste-sorting plant, HannoverPlanning, delivery, installation, commissioning, testing and turnkey delivery of a waste-sorting plant.continue
-
SMARTFERM-conditioning, Bad OeynhausenSMARTFERM is the world's first semi-mobile dry fermentation plant. The in-house development of Eggermann Anlagenbau GmbH & Co. KG is coming up in a very short time on their site.continue
-
Fermentation and conditioning facility in Mainz-EssenheimIntegration of a dry fermentation plant in the compost plant Mainz-Essenheim.continue
-
MSW treatment plant Varna, BulgariaDelivery, assembly and commissioning of the mechanical treatment and the composting technique of the new erected municipal solid waste treatment plant of the City of Varna with a throughput of up to 140.000 tons/year.continue
-
Two bridges over the river Agger, City of OverathConstruction of two steel bridges for pedestrians and cyclists over the river Agger.continue
-
Indoor swimming pool, RietbergConstruction of an indoor swimming pool. Size of pool: 10 m x 25 m. Raisable floor allowing variation of water depth between 0.60 m and 1.80 m.continue
-
Construction of an office building, BielefeldConstruction of the building shell with 5 floors for an administration building.continue
-
New material flow splitting system, WolfenbüttelConstruction of a new material flow splitting system at the landfill Bornum, Wolfenbüttel district.continue
-
Dry fermentation plant, Hamburg21 rotting tunnels as an extension of the existing composting plant Bützberg, municipal sanitation Hamburg.continue
-
Flood control basin, BönenThe construction oft he flood control basin near by the town of Bönen is part of the ecological reconstruction of the stream Seseke in the lot between km 17,324 and 19,382 at the historical arch bridge of he railroad track from Unna – Hamm for the client Lippe Verband.continue
-
RÜB Vatheuershof, city of AhlenConstruction of a stormwater settling tank/rainwater overflow basin with throttle structure for the city of Ahlen in the industrial area in Vatheuershof 59227 Ahlen.continue
-
Dry fermentation and intensive rotting plant, WürselenExtension of the existing compost plant in Würselen with a fermentation plant with intensive rotting process in Kompoferm plus procedure.continue
-
Throttle-structure and culvert structure across the water Werse, AhlenSlot- and throttle-structure and a box-type culvert structure across the K 28 for flood protection on the water "Werse" in Ahlen.continue
-
Fermentation plant GBAB, AschaffenburgConstruction of a dry fermentation plant consisting of 5 fermenter tunnels with underground percolate storage tanks.continue
-
Company building, GFMR Barracks AugustdorfNew construction of the company building 5./215 in the General Field Marshal Rommel-Barracks, Augustdorf.continue
-
Fermentation plant VIVO, WarngauModification of the Warngau composting plant into a combined dry fermentation and composting plant.continue
-
Construction of the Elementary-School MittelhaanConstruction of the Elementary-School Mittelhaan incl. Music-School from April 2010 to July 2011 (estimated) for the Municipality of Haan.continue
-
Extension of the 4-star hotels Lind Rietberg to a total of 80 roomsAlready 2 years after completion, the hotel capacity was doubled in the year 2010.continue
-
Erection of a Waste Sorting-, Recycling- and Composting Plant in Dohuk/Kurdistan IraqStart of construction work February 2010, end December 2010.continue
-
Erection of a PET-recycling plant, HammBuilding of a PET processing plant in Hamm: New administration building, a processing hall with social area and a storage bunker.continue
-
Brigde of the B1 crossing the L776 between Salzkotten and Paderbornconstruction of the traffic junctioncontinue
-
Penny supermarket, ErwitteReconstruction and extension of 4x41m sales area of the Penny supermarket in Erwitte: Construction time: June 2009 untill August 2009. The time the supermarket was fully closed to rebuild the interior was only 2 weeks.continue
-
Box culverts, LangenholzhausenExecution planning, structural design and construction of 3 box culverts for the Pferdebruchbach along the B238n in Kalletal-Langenholzhausen.continue
-
New building of a refuse reloading hall at the landfill Breinermoor in WestoverldingenConstruction period from June until September 2009continue
-
FWG Königswinter, KönigswinterTurnkey construction of a fire brigade equipment with 4 garage places from June 2009 to July 2010 for the municipality of Königswinter.continue
-
Bridge "Am Mühlenweg", DortmundConstruction of a bridge for pedestrians and biker within the roadworks „Am Mühlenberg“ in Dortmund.continue
-
Pig fattening stable with grain storage, SalzbergenConstruction of a pig fattening stable for almost 2000 pigs, extension of an existing grain storage to three fields, construction of an additional stainless steel liquid manure tank and structural alteration of a horizontal silo in Salzbergen.continue
-
House reconstruction and extension, RietbergHouse reconstruction and extension of the single family house Stücker in 33397 Rietberg. Client: Christian Stücker, constrction time: January 2009-May 2009.continue
-
Fire fighting and rescue station, BocholtPlanning of the building and the external facilities, turnkey erection oft he building, incl. workshop equipment and furnishing, external facilities and routes, parking lots, fencing and planting.continue
-
Fire fighter station, Dormagen-GohrTurnkey project of the fire fighter station of Dormagen-Gohr, from December 2008 till September 2009 for the Municipality of Dormagen. The machine depot offers three pitches for the Volunteer Fire Department.continue
-
Fire-Fighting Machine-Hall, Leer-LogaTurn-Key-Project of a Fire-Fighting Machine-Hall incl. general planning without exterior facilitiescontinue
-
Expansion of the Central wastewater treatment plant Rietberg, 2nd building section, sludge treatment and CHPThe Rietberg Central wastewater treatment plant was expanded to a design capacity of 60,000 inhabitants.continue
-
Construction of the bridge of the B514 accross the B238nAs part oft he bypass Langenholzhausen, the bridge is going to be built as a 3 section prestressed concrete bridge.continue
-
Multipurpose hall, EverswinkelConstruction time was from August 2008 until August 2009. The multi purpose hall offers place for a sporting area, consisting of 2 volleyball fields, 6 badminton fields and one football and handball field.continue
-
Fire-figthing depot, Troisdorf-SpichTurnkey construction of a fire brigade depot with 2 parking lots, from July 2008 to December 2008 for the municipality of Troisdorf.continue
-
Construction of the theatre Gütersloh. One of the most challenging sites of Germany.The planned construction volume was 23 million Euros. The theater can accommodate 480-530 people, the stage is accessible from all sides. Plus an impressive lobby and storage and rehearsal rooms, all according to the latest state of the knowledge and technique and all with the restrictions due to the tight and narrow innercity site of 100 x 150 metres. Because of the local building regulations and the direct vicinity of the water tower under monument conservation, the height from ground level was restricted to 26.5 metres. However, the site is already part of the local skyline. The construction works did start in June 2008.continue
-
KOMPOFERM® - Dry fermentation, Straubing/AiterhofenFor the council of Straubing, the building was erected from May 2008 until October 2008. Warm startup was in November 2008, final acceptance of the fully functional plant was in February 2009.continue
-
Mense Washing FacilityNew construction of the Mense washing facility in Gütersloh 2008. 2 portal washing facilities 1 technical room 1 free washing area Ready for immediate occupancy except for domestic technology, machine technology and outside facilities.continue
-
Cyrel® pressure plates fabricating shop, Neu-IsenburgConstruction of a storage hall, ready for immediate occupancy, with high-quality technical equipment in Neu-Isenburg from February 2008 until September 2008 for Du Pont de Nemours (Germany), Ltd. Adherence to the labour and safety regulations was of very high priority for the client. These even exceed the legal stipulations of the Federal Building Law. It was possible to meet these high standards thanks to a thorough work preparation and analysis of endangerment.continue
-
Municipality depot, HaanTurnkey-project of the municipality depot of Haan from February 2008 until December 2008 for the city of Haan.continue
-
New construction of 6 DHH and 4 SFH, BielefeldNew construction of 6 duplex halves and 4 single-family houses with garages in Bielefeld Sennestadt, construction district Keilerweg. Extent of service F+E: preliminary building work including earth works, excluding brick construction. Beginning of construction: November 2007 Completion of preliminary building work: March 2008continue
-
Expansion of the production halls EAB, Bad OeyenhausenExpansion and change of utilisation of the production halls of Eggersmann Anlagenbau (Plant Engineering and Construction) GmbH & Co. KG, Bad Oeyenhausen, for Margarete Eggersmann from September 2007 to February 2008.continue
-
Production/ storage hall, Herzebrock-ClarholzCarcass of a production and storage hall with social and technical wing, staining hall and bicycle station in Herzebrock-Clarholz from October 2007 until May 2008 for Rippert Real Estate Co. Ltd. The highest demands were made on the exposed concrete character during this construction project. All corners and concrete section were made with sharp edges. The casing and anchorage points were subject to a precise specification of requirements.continue
-
Office buildings, Municipal Works, BielefeldPreliminary building work of an office building with canteen for the Bielefeld Municipal Works 2007.continue
-
Beumer hall extension, BeckumPlanning and new construction of a production hall in Beckum. Completion of construction project in 2007, ready for immediate occupancy.continue
-
Dry Fermentation Plant, SchweinfurtDry Fermentation Plant, District of Schweinfurt 2007. Planning and construction of a dry fermentation plant with 8 reinforced concrete tunnels, Reinforced concrete round containers as percolate fermenters with gas storage, fill walls and refuse transfer hall including outside facilities.continue
-
PPP City Hall, FreudenbergFollowing a Europe-wide announcement, the firm Fechtelkord & Eggersmann has been granted this contract for its offer to plan, build, finance and maintain for 25 years. This new construction replaces the old City Hall at the same site as well as two other municipal buildings, thus centralising the municipal administration. The old City Hall was demolished in June 2007 and the opening for the new City Hall was celebrated on 5 September 2008.continue
-
Wohnheim Westfalenkolleg, BielefeldNew construction of a resident complex for the Westfalenkolleg Bielefeld 2007, ready for immediate occupancy.continue
-
Bale storehouse Tönsmeier, Porta WestfalicaBale storehouse for the firm Tönsmeier in Porta Westfalica ready for immediate occupancy.continue
-
Fire-figthing depot as PPP-model, HalverTurn-key project of the fire fighting depot in Halver as a PPP modell, from February 2007 until March 2008 for the municipality of Halver.continue
-
Construction of halls and office/social buildings, HannoverNew construction of a waste-sorting hall, a waste compression hall and a workshop /office / social building, ready for immediate occupancy, from December 2006 until August 2008 for Veolia Environmental Service West Co. Ltd. (formerly SULO).continue
-
Lind Hotel, RietbergLind Hotel on the Ems River, preparation of a 4-star hotel with restaurant, bar and spacious wellness area, ready for immediate occupancy. Planning, construction and opening 2007.continue
-
New construction of a storage hall, MarienfeldExpansion of the plant in Marienfeld by one storage hall behind Plant 3 from September 2006 until November 2006 for Reiling GmbH & Co Property Management, Ltd.continue
-
Fire Department, BergheimHanding over the Fire Department in Bergheim for immediate occupancy and ensuing monitoring of central installations.continue
-
Fire-fighting depot, Neukirchen-VluynTurn-key project of a fire fighting depot with class rooms, from August 2006 until February 2007 for the municipality of Neukirchen-Vluyn.continue
-
BA Rosenow Post-Decomposition Shed, RosenowWaste Treatment Plant in Rosenow – expansion of the biological level – post-decomposition shed, construction section. Size of hall is 8,400m² at 140 m length and 60 m width. Construction ready for immediate occupancy, except for electrical works, from July 2006 until May 2007 for the ABG Ostmecklenburgisch-Vorpommersche Waste Treatment and Removal Company, Ltd.continue
-
New construction of a storage and event hall, OeldeConstruction of a storage and event hall, ready for immediate occupancy (except for technical building installation), from August 2006 until December 2006 for W. Pott-Feldmann GmbH & Co KG. Size of hall is 33 m x 37 m, clearance height 8 m. For optimum utilisation, 36-metre-long unsupported reinforced concrete girders were built in.continue
-
New construction of a storage hall, RosenowNew construction of a storage hall in Rosenow, ready for immediate occupancy, from June 2006 until October 2006 for the OVVD Ostmecklenburgisch- Vorpommersche Verwertungs- und Deponie GmbH (Utilisation and Dumping Ground, Ltd). The heat insulation was given special consideration during the execution of this project.continue
-
Stücker Agricultural Technology, BeckumNew construction of a workshop and exhibition building with offices and a centre for replacement parts together with a flat for the production manager, ready for immediate occupancy, in Beckum. Thanks to its exposed location, the building is very clearly visible from the A2 motorway, Beckum exit.continue
-
Renovation of the swimming pool, Timmendorf BeachDemolition and carcass for the restoration of the swimming pool in the Maritim Seehotel at Timmendorf Beach from October 2005 until July 2006 for Reinhardt and Sander. The demolition and construction work took place within the building. The use of large tools and lifting gear was not possible. The execution of the works was a great challenge for the logistics of the building site.continue
-
New Construction of the Sport Hotels, MarienfeldExpansion of the hotel facilities for the 2006 Soccer World Championships. Home of the Portuguese national soccer team.continue
-
Meat Factory in WindauTwice as many production rooms at the meat factory in Windau - in constant operationcontinue
-
Light Packaging–Sorting Plant, BraunschweigWith an average annual throughput production of 115,000 tonnes, this is Europe’s most modern sorting plant for light packaging.continue
-
Recycling Plant for Office Waste, LondonBywater offers complete recycling concepts and extensive waste management services in London and in the southeast part of the country for various branches.continue
-
Light Packaging Plant, WalldürnCompletely automatic sorting installation with many technical refinementscontinue
-
PPP Schools RietbergPPP Schools "Planning, construction and operation of the School for Teachers’ Assistants and the School for the Mentally Handicapped in Rietberg. First model in Germany with porter and secretary operation."continue